8/13 - Nylon Screw feasibility assessment done.  All is well, now it's time to work on the CAD Drawings for Ben.

8/11 - Well, there hasn't been much to update on but if you want to see something check this out. Click Here

4/19 - Removed dimensions of CubeSat module from structures webpage (Replaced with CAD Drawings.)

  • Structures meeting on every Friday at 3:30pm in the ICML Lab (HOLM210)

  • Thermal meeting on every Monday at 12:30pm at POST207

  • Updates for the Thermal and Structures Group Webpages

 

Links

Last updated: never

 
Maintained by: jq